Sink removed, skirt-board removed, the rest of the wall broken down, everything is stripped.
Construction materials have arrived. Mostly wooden boards and beams.
The bath-outlet is pretty high apparently, and the shower-basin will need to be above that height, so some of this wood will build a stage on which to place the shower unit.
The rest will rebuild that wall, only longer to also contain and hide the new toilet cistern and accessible stop-cocks.
And I guess also new skirt and stuff, I dunno.
This is my weekend then: Wobbly toilet with bucket-flush, no shower, no bath, not even a sink in the loo.
Will have to wash my hair and sponge-bath in the kitchen sink at some point in the weekend.
And next week, things should start being built instead of just destroyed.